If an allotment temporarily has a scope of 0, reservations can still be made from allotment as long as the tolerance period has been defined accordingly. In this period, reservations fall into the so called “gap”. This is now also shown in the allotment rack with a separate line.
i N.B. Tolerance periods are defined by configuring registry keys [5946] and [5947]. I.e. this allows reservations x days prior or after the beginning or end of a contract or when the scope is 0.
Figure 13: Additional line gap in the allotment rack